TCEQ and Edwards Aquifer Rules: A San Marcos Guide
The TCEQ and Edwards Aquifer rules that actually shape a San Marcos job - what can't be burned, where C&D goes, why loads are covered, and why the recharge zone matters.

In this guide
- Burning construction debris is prohibited
- C&D goes to a Type IV landfill
- The Edwards Aquifer recharge zone
- Loads must be covered
- How we keep you compliant
You don't need to be a regulations expert to clear a project in San Marcos - but a few TCEQ and Edwards Aquifer rules genuinely shape how it's done, more here than in most places. Here's the plain-language version of the ones that matter.
Burning construction debris is prohibited
TCEQ prohibits the open burning of construction and demolition debris. On top of that, Hays County is frequently under a burn ban during Central Texas drought that stops open burning of almost anything.
And treated lumber can't be burned at any time - the preservatives turn toxic in smoke. So burning is off the table for project debris; it has to be hauled.
C&D goes to a Type IV landfill
Construction and demolition debris has to go to a permitted facility - in Texas, a Type IV landfill specifically permitted for that waste stream. The county recycling and solid waste centers are for household material and can't take it.
This is the core reason a real project needs a roll-off: the debris has a specific, permitted destination, and a container is how it gets there in one load.
The Edwards Aquifer recharge zone
San Marcos sits over the Edwards Aquifer recharge zone - the porous ground that feeds the springs, Spring Lake and the San Marcos River. TCEQ's Edwards Aquifer rules require keeping construction-site sediment, runoff and debris from reaching the recharge features.
The spring-fed river just downstream is home to federally protected species, so keeping a site's debris contained isn't optional here - it's a genuine part of doing the job right.
Loads must be covered
Texas requires loads to be secured and covered for transport, so debris doesn't end up on the road. Every load we haul is sheeted and secured for the run to the landfill.
It's a small thing that matters - an uncovered load is both a hazard and a violation, and exactly the kind of detail a local hauler handles without you thinking about it.
How we keep you compliant
Put together, these rules decide how a San Marcos job's debris leaves the property: no burning, C&D to a permitted Type IV landfill, loads covered, the recharge zone kept clean, and hazardous and special wastes to their own channels.
A local roll-off service folds all of that into one flat price and one process - so you stay compliant with TCEQ and Hays County without making a study of it.
Book a container in San Marcos
One flat rate covering delivery, seven days, pickup and disposal.
(737) 214-1227Questions readers ask about this
Does TCEQ let me burn construction debris?
No. TCEQ prohibits open burning of C&D, Hays County is frequently under a burn ban, and treated lumber can't be burned at all. Project debris has to be hauled.
Where does C&D legally go in San Marcos?
To a permitted Type IV landfill - the class of landfill permitted for construction and demolition waste. County recycling centers are household-only and can't take it.
Why does the Edwards Aquifer matter?
San Marcos sits over the recharge zone that feeds the springs and river. TCEQ rules require keeping construction sediment, runoff and debris out of it - so containing your debris is part of the job.
Do dumpster loads have to be covered?
Yes. Texas requires loads secured and covered for transport so debris doesn't reach the road. Every load we haul is sheeted for the run to the landfill.